1. Site assessment and load calculation
2. Approvals, where grid connection is involved
3. Civil and structural preparation
4. Panel erection, evaporator, and refrigeration piping
5. Electrical integration of PV, storage, VFD, and protection devices
6. Testing and commissioning




